MARKET Long-span Bridges
New Nangklao Bridge
New Nangklao Bridge is a cast-in-place prestressed concrete bridge constructed by the balanced cantilever method. The main span length is 229 m with side spans of 130 m. The width of the bridge is 26.80 m with 6 traffic lanes. The bridge is founded on bored piles through soft layers to 50-60 m depth. The new bridge continues over the Sanambin Nam intersection. Total length of the bridge is 1,685 m. Improvement of connecting roads to harmonize with the New Nangklao Bridge makes the total length of the project 2.5 km. Overall budget of the construction work is approximately 1,400 million baht.