MARKET Underpass & Tunnel

Kabinburi-Pakthongchai Tunnel

Client: Department of Highways (DOH) (Italian-Thai Development Public Company Limited)
Date: 2016
 
Services Rendered:
» Independent Design Check
» Detailed Design
 
NCE was responsible for independent design check of a three pinned precast concrete arch tunnel and detailed design of the portals. The tunnel is located on Highway No. 304 between Kabinburi and Pakthongchai. It is constructed as twin tunnel with 3 lanes + sidewalk in each direction.