MARKET Rapid Construction

SRT Red Line

Client: State Railway of Thailand,Unique Engineering and Construction PCL.
Date: 2009-2012, 2015-2020
 
Services Rendered:
» Value Engineering Design
» Alternative Design
» Construction Supervision
 

NCE is responsible for alternative design and construction supervision of SRT Red Line project (Bangsue-Talingchan), including total 8 km elevated railway structure. The structures consist of typical viaduct structure 3x40 m continuous spans built by precast segmental box girders and cast-in-situ balanced cantilever bridges crossing Chao Phraya River and Khlong Bangkok Noi.

NCE is also responsible for value engineering design and construction supervision of SRT Red Line project (Bangsue-Rangsit) including the innovative design of precast portal frame structures in Bangsue Grand Station area. The portal frames were precast segmental hollow box with external prestressing.