MARKET Long-span Bridges
Bhumibol I and Bhumibol II Bridges
The study concluded that the construction of two cable-stayed bridges was the best alternative. The second phase of the project included detailed design and tender documents for the two bridges with approaches. Construction started in 2002 and the project opened to traffic in September 2006.
NCE acted as lead consultant and provided Project Manager, Bridge Engineers, Traffic Planner, Foundation Engineer, Dynamic Expert, Computer Experts (CAD) and Contract Expert.