MARKET Rapid Construction
MRTA Purple Line
Client: CH. Karnchang PCL, Sino-Thai Engineering & Construction PCL
Date: 2010-2012
Services Rendered:
» Value Engineering
» Construction Engineering
Redesign and construction stage checking of superstructure and substructure as follows:
- Continuous span elevated viaduct supported by barrette piles 2-1x3 m.
- Station barrette piles 4-1.2x3 m.
- Long span bridge of 40+60+40 m
- Portal frames with span of 16-40 m.
- Cantilever and T-head column with pier height of 20-26 m.
- Crossbeam of platform and concourse for the typical station.
- Redesign of Entrance Buildings
- Redesign of Tao Poon Station